Delaware River Port Authority, PATCO Control Center Relocation

Delaware River Port Authority, PATCO Control Center Relocation

Project Overview

The Delaware River Port Authority decided to relocated its PATCO Control Center tower and update the existing tower at its Lindenwold yard to serve as a backup control center. Three separate locations were considered.  Envision provided detailed cost estimating services for the proposed move, which entailed the migration of existing systems, infrastructure, and personnel to the new facility from its current location, and establishing the existing control center as a back-up.

Project Information

Owner Delaware River Port Authority (DRPA)
Project Start September 2016
Project End March 2018
Project Cost $15m
Envision’s Role
  • Cost Estimating