Project Overview

The $1.1M flooring system upgrades at PATCO’s 8th & Market, 9th & Locust, 12th/13th & Locus, and 15th/16th & Locus stations in the City of Philadelphia consisted of removing and preparing the existing epoxy floors to receive a new finish, including minor and major floor cracks. Following preparation, a new floor finish consisting of an epoxy coating and urethane topcoat with non-skid additives was installed within 120 calendars days during low ridership periods (nights and weekends).

Envision provided construction inspection services for the PATCO Station Floor Upgrades.

Project Information

Owner Delaware River Port Authority (DRPA)
Project Start August 2019
Project End November 2019
Project Cost $1.1M
Envision’s Role
  • Construction Inspection